Welcome to F.I.E.L.D.- the First Ismaili Electronic Library and Database.

Hydro-Electric Dam

Afghanistan- MoU Signed on $631m Hydropower Dam in Badakhshan 2019-03-20

Afghanistan- MoU Signed on $631m Hydropower Dam in Badakhshan   2019-03-20
Source: 
MENAFN

(MENAFN - Daily Outlook Afghanistan) KABUL - A Memorandum of Understanding (MoU) was signed on Tuesday at the Presidential Palace on power supply to northeastern Badakhshan province and construction of a hydroelectric dam there at a cost of $631 million.

A statement from the Presidential Palace received by Pajhwok Afghan News said the MoU was signed between acting energy and water minister Mohammad Gul Khulami and Da Afghanistan Breshna Sherkat (DABS) head Eng. Amanullah Ghalib and representative of the Aga Khan Development Network (AKDN).

President Museveni and the Aga Khan Inaugurate Bujagali Hydropower Plant 2012-10-08

His Highness the Agha Khan greets Uganda's ministers Irene Muloni and Daudi Migereko during the commissioning of the Bujagali da

Jinja, Uganda, 8 October 2012 — His Excellency President Yoweri Kaguta Museveni today inaugurated the 250MW Bujagali Hydropower Plant in the presence of His Highness the Aga Khan.


Syndicate content

Back to top